MEMINIMUMKAN WAKTU PRODUKSI SANDAL DENGAN PENJADWALAN METODE CDS (Studi pada CV AWMK)

Asni Mustika Rani

Abstract


Scheduling is said to be good when it can meet the needs of companies and consumers feel satisfied. The purpose of scheduling is to minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce costs. The problem in terms of punctuality causes unfulfilled consumer demand. The purpose of this study is to analyze the current production scheduling in CV AWMK, what methods are used and recommend production scheduling to minimize production time. The results showed that the production scheduling with CDS method can minimize production time, 15 days faster than by using the current production scheduling.

Full Text:

PDF

References


Buku

Heizer, J., Render, B. 2011. Operations Management 10th Edition. England: Pearson Education Limited

Krajewski, L.J., Ritzman, L.P., Malhotra, M.K. 2010. Operations Management Processes and Supply Chains 9th Edition. United States. Prentice Hall

Panneerselvam.R. 2012. Production and Operations Management third Edition.. New Delhi: Asoke K Ghosh.

Reid, R. Dan., and Sanders, Nada R. 2010. Operations Management An Integrated Approach 4th Edition. New Jersey : Wiley

Russel, R.S., Taylor, B.W. 2011. Operations Management Creating Value Along the Supply Chain 7th Edition. United States. John Wiley & Sons, Inc

Stevenson, William J., and Chuong, Sum Chee. 2010. Operations Management : An Asian Perspective. Singapore: McGraw-Hil

Sugiyono. 2008. Statistika untuk Penelitian. Bandung: Alfabeta

Jurnal

Adhy, Satriyo, Kushartantya. Penyelesaian masalah Job Shop Menggunakan Algoritma Genetika. Jurnal Masyarakat Informatika, Vol. 1, No 1, ISSN 2086-4930.

Odior A.O, Charles-Owaba.O.E, Oyawale F.A. 2010. Aplication of Job Scheduling in Small Scale Rice Milling Firm. ARPN Journal of Engineering and Applied Sciences. Vol 5. ISSN 1819-6608.

Putra, Rahmat Setiawan, Sri Mumpuni Retnaningsih. Penjadwalan Kereta api di Daerah Operasi 8 Surabaya. Institut Teknologi Sepuluh November, Jurusan statistika.

Saptaningtyas, Fitriana Yuli. 2013. Optimasi Pengelolaan Pariwisata di DIY dengan menggunakan Metode Campbell Dudeck Smith (CDS)

Tan, Hendy Tannady, Steven, Andrew Verrayo Limas.2013. Solusi Urutan Pengerjaann Job yang Tepat dengan Metode Campbell-Dudek-Smith (CDS)

Vladamir Modrak, R.Sudhakara Pandian. Flow Shop Scheduling algorithm to Minimize Completion Time For n-Jobs m-Machines Problem. ISSN 1330-3661.




DOI: https://doi.org/10.29313/performa.v0i2.2625

Refbacks

  • There are currently no refbacks.


Copyright (c) 2017 Jurnal Manajemen dan Bisnis: Performa

Jurnal manajemen dan bisnis (Performa) diindeks oleh:


Alamat Redaksi:

Jl. Tamansari 1, Bandung 40116, Jawa Barat, (022) 4203368 pes. 210, (022) 4264064. jmb.performa@gmail.com / jmb.performa@unisba.ac.id

 

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International LicenseISSN 1829-8680 | E-ISSN 2599-0039